| greatindian | HMR to have 3 service tracks on : September 14, 2013 - 16:00:15 PM |
|
In a bid to prevent the metro rail from obstructing the tracks due to any technical glitch or breakdown, the L&T Metro Rail Hyderabad (L&TMRH) will construct three service tracks (pocket tracks), at different locations on the three metro rail corridors.With the elevated Hyderabad Metro Rail (HMR) project proceeding at a brisk pace, these service tracks will be constructed between Sanjeevaa Reddy Nagar and Ameerpet (Miyapur to LB Nagar on Corridor-1), Chilkalguda-Bhoiguda (JBS to Falaknuma on Corridor-2) and between Shopper’s Stop and Hyderabad Public School at Begumpet (Nagole to Shilparamam on Corridor-3).These tracks are being built by the L&TMRH as part of safety measures and will be a few metres away from the running tracks. The service tracks are proposed for emergency needs. The L&TMRH and HMR officials told City Express that if a metro train develops a sudden technical glitch, it would lead to disruption of services of the other trains on that corridor.To avoid any inconvenience to commuters, the faulty train would be shifted to the service tracks to clear the line. Later, it would be shifted to the designated Metro rail depot for repairs. The first model coach of HMR, manufactured by Korean-based Hyundai-Rotterdam, is expected to reach Hyderabad by this month end.The prototype has already started its journey from South Korea through the high seas and is expected to reach Chennai at the earliest before being brought to Hyderabad. |
| puneetmafia | शताब्दी तक पहुंचना हुआ सरल, प्लेटफार्म-6 का शुभारंभ on : September 14, 2013 - 17:55:54 PM |
|
भोपाल। |
| nikhilndls | अंबाला दिल्ली के बीच चलने वाली नई ट्रेन का करेंगे स्वागत on : September 14, 2013 - 17:56:15 PM |
|
सहारनपुर दिल्ली के बीच के बीच बहुप्रतिक्षित नई एक्सप्रेस ट्रेन के संचालन पर जिले के व्यापारियों व उद्यमियों ने हर्ष जताया है। ट्रेन के प्रथम बार सहारनपुर आगमन पर भव्य स्वागत का किया जायेगा। |
| AllIsWell | Secunderabad-Kakinada special trains on : September 14, 2013 - 17:56:22 PM |
|
The South Central Railway will run two special trains between Secunderabad and Kakinada to clear extra rush of passengers. |
| RailXpert | Five lifts at railway station by month-end on : September 14, 2013 - 17:56:28 PM |
|
The Divisional Railway Manager (DRM) Pradeep Kumar on Friday said that five lifts at Vijayawada Railway Station would be operational by the end of September. In addition, five escalators would be put to use. Of this, two are already functioning, and three more were installed recently, he said. Another five lifts would be installed in the division; two lifts each at Rajahmundry and Ongole and one lift at Eluru. Escalators have been sanctioned for stations like Guduru, Ongole, and Samalkota, he said. |
| eabhi200k | ‘Vijayawada Railway Division overshoots targets in Hindi’ on : September 14, 2013 - 17:56:38 PM |
|
The Raj Bhasha Diwas (Hindi Day) celebrations at the Vijayawada Railway Divisional headquarters touched a new high with Divisional Railway Manager Preadeep Kumar announcing its achievement in implementation, which was much beyond the targets given to it. |
| puneetmafia | Pookkalam contest in Railway office on : September 14, 2013 - 17:56:44 PM |
|
As part of the Onam celebrations, the Hindi organisation of the Palakkad railway division organised a Pookkalam contest at the divisional office at Olavakkode here on Saturday. . The Pookkalam arranged by the Signal and Telecommunications branch was adjudged the best, and those by the Personnel branch and the Operating branch bagged the second and third positions. — Staff Reporter |
| eabhi200k | Railways invites bids for Amethi MFC on : September 14, 2013 - 17:56:53 PM |
|
LUCKNOW: Railway ministry has fast-tracked the plan to develop a multi-functional complex (MFC) in Amethi. The Rail Land Development Authority (RLDA), coming under railway ministry, will develop 75 MFCs on railway land for generating revenue across the country.The bidding process is being initiated in phases. So far, RLDA has invited nine bids for development of 43 MFCs at prominent stations in the country. In UP, the bidding has been started only for Amethi. Sources said though other stations in the state have land available, they were not given the preference. TNnAllahabad is the only station where MFC has been completed and waiting to be leased out along with MFCs at 25 other stations in the country which were taken up last year.MFCs will have facilities like shopping, food stalls/restaurants, book stalls, ATMs, medicines and variety stores, budget hotels, parking etc., for rail passengers.A multi-functional complex project offers unique opportunity for retailers, hotel chain operators, developers and other such stakeholders for expanding and enlarging their footprint across hundreds of important towns and cities in the country. |
| railenquiry | ‘Vijayawada Railway Division overshoots targets in Hindi’ on : September 14, 2013 - 17:56:57 PM |
|
The Raj Bhasha Diwas (Hindi Day) celebrations at the Vijayawada Railway Divisional headquarters touched a new high with Divisional Railway Manager Preadeep Kumar announcing its achievement in implementation, which was much beyond the targets given to it. |
| nikhilndls | New Rail Line Could Connect Burma to Northeast India on : September 14, 2013 - 17:57:14 PM |
|
An Indian railway company is preparing to connect the northeast Indian state of Nagaland with Burma, according to a local media report. The Nagaland Post on Thursday quoted an official from Northeast Frontier Railway saying the company was planning new lines to connect northeastern India with both Burma and Bangladesh. It said a survey was being conducted on a 160-mile line to link Indian states Nagaland, Mizoram, Manipur, Tripura and Arunachal Pradesh to Tamu, in Burma’s Sagaing division. The plan is sanctioned by Indian Railways and could see new track laid in the next few years, the report said. |
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|
