| RailEnquiry Admin | Puri – Somnath Special train to stop at Srikakulama Road and Palasa also on : May 13, 2017 - 09:56:11 AM |
|
Special train between Puri and Somnath starting its trip from May 13 got additional stoppages as Srikakulama Road and Palasa in its list. Both in up and down direction this special train will also halt at these two stations as per details – Somnath - Puri Special Train
Puri - Somnath Special Train
Train stoppages – Veraval, Keshod, Junagadh, Jetalsar, Virpur, Gondal, Bhakti Nagar, Rajkot, Wankaner, Surendra Nagar, Ahmedabad, Nadiad, Annand, Vadodara, Bharuch, Surat, Nandurbar, Amalner, Jalgaon, Bhusaval, Malkapur, Shegaon, Akola, Badnera, Wardha, Nagpur, Gondia, Raj Nandgaon, Durg, Raipur, Mahasamund, Khariar Road, Kantabanji, Titlagarh, Kesinga, Rayagada, Vizianagaram, Ichhapuram, Brahmapur, Balugaon, and Khurda Road |
| RailEnquiry Admin | Dornakal- Bhadrachalam Road Passenger timings revised on : May 13, 2017 - 09:47:44 AM |
|
Train number 57145 Dornakal- Bhadrachalam Road Passenger will run with revised timings from May 22. The revised timings will also reduce the distance by 20 minutes as per details –
|
| RailEnquiry Admin | Manuguru - Secunderabad Kakatiya Passenger speeded up by 1hr and 30 minutes on : May 13, 2017 - 09:44:31 AM |
|
South Central Railway has revised timings of train number 57626 Manuguru - Secunderabad Kakatiya Passenger. As per the new timings this train is now speeded up by 1hr and 30 minutes. The new revised timings will be effective from May as per details –
|
| RailEnquiry Admin | Temporary halt at Uruli station for many trains for annual function of Shri Prayagdham Trust on : May 13, 2017 - 09:26:26 AM |
|
For convenience of pilgrims attending annual function of Shri Prayagdham Trust at Uruli station Central railway has provided temporary stoppage for many trains at Uruli. Following trains will stop at Uruli station as per given details –
|
| RailEnquiry Admin | रीवा - हबीबगंज और कोटा - कटरा में अतिरिक्त कोच on : May 13, 2017 - 09:17:18 AM |
|
यात्रियों की भीड़ को देखते हुए पष्चिम मध्य रेलवे ने दो गाड़ियों अतिरिक्त डिब्बा अस्थाई रूप से लगाने का निर्णय लिया है| रीवा - हबीबगंज और कोटा - कटरा में एक शयनयान डिब्बे एक एक दिन के लिए लगाए जाएंगे जिसकी जानकारी नीचे दी हुई है -
|
| RailEnquiry Admin | Varanasi – Jammu Tawi – Varanasi Begumpura Express to run through diverted route on : May 12, 2017 - 21:48:15 PM |
|
Train number 12237 /12238 Varanasi – Jammu Tawi - Varanasi Begumpura Superfast Express was cancelled from May 12 to May 19 due to non-interlocking and doubling work on Lucknow-Sultanpur-Zafrabad section of Lucknow Division. According to latest notification this train will now run via diverted route through Varanasi-Pratapgarh-Raebareli-Lucknow. According to railway officials, decision to run this train via diverted route is taken due to heavy passenger traffic. |
| RailEnquiry Admin | Yesvantpur- Karwar Express to run late till June 9 on : May 12, 2017 - 21:10:07 PM |
|
3 hours of traffic block will be taken up till June 9 in Mangaluru Jn. – Padil - Jokatte Section for maintenance work. During this period train number 16515 Yesvantpur- Karwar Express will be regulated for 30 minutes at Mangaluru junction on every Monday,Wednesday and 05 minutes on every Friday till June 9. |
| RailEnquiry Admin | Night block between Churchgate and Mumbai Central on midnight of Saturday on : May 12, 2017 - 20:51:59 PM |
|
A night block will be taken on Up & Down fast lines from 00.30AM to 05.00AM during midnight of Saturday, 13th May, 2017 and Sunday, 14th May, 2017 between Churchgate and Mumbai Central local stations for maintenance of track, signaling and overhead equipments. During the block all Up & Down fast line trains will run on Up & Down slow lines between Churchgate and Mumbai Central local stations. Due to this, some Up & Down local trains will remain cancelled, the list of cancellation will be available with on duty Station Masters. |
| RailEnquiry Admin | Six Lucknow and Katra bound trains to get extra coach temporarily on : May 12, 2017 - 20:48:36 PM |
|
To meet heavy demand of travelers southern railway will augment extra coach this summer season in 6 trains as per details temporarily –
|
| RailEnquiry Admin | List of trains passing through Chennai Central affected till May 30 on : May 12, 2017 - 20:38:13 PM |
|
Due to engineering work in Arakkonam yard till May 30 following trains will be affected –
|
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|
