| greatindian | South East Central Railway (SECR) changes platform on : September 15, 2013 - 20:56:22 PM |
|
South East Central Railway (SECR) changes platform numbers at Gondia railway station. From Thursday, platform number 3 will become platform number 7. Earlier, this platform was rechristined as platform number 4A. |
| puneetmafia | Pune-Daund rail route electrification on track on : September 15, 2013 - 20:56:36 PM |
|
PUNE: The much-awaited electrification work of the 76-km Pune-Daund railway route will take another year for completion. Authorities said about 35% of the work has been completed so far, and that the remaining work will be completed by September 2014. Work commenced about 10 months ago in December 2012.Authorities said that work was underway as per schedule and that there have been no delays or hurdles so far. The project includes electrification of a section of 104 km, of which the Pune-Daund section is 76 kilometers long and Daund-Bhigvan section is 28 km long. The total cost of the project is Rs 167 crore.The electrification of Pune-Daund section is vital to improve rail services in Pune region. There was a long pending demand of rail commuters for electrification of this section mainly to establish a direct link of electrical multiple unit (EMU) rakes (local trains) between Lonavla, Pune and Daund.While the rail track between Lonavla and Pune is electrified, the Pune-Daund section is not, and so trains plying on this stretch run on diesel engines. Hundreds of commuters in suburban areas such as Pimpri Chinchwad, Khadki, Talegaon who wish to travel to Daund get down at Pune station to catch another train to travel to Daund.A railway administration official said, "Electrification of Daund section is on priority. We are aiming to complete the work within stipulated time period. The work is underway in phases. We have begun with laying of foundations for poles. There is a plan to fix about 3,000 poles up to Daund to lay overhead electric cables and we have so far laid foundations for 1,800 poles. About 300 poles have been erected in Loni-Daund section. Work on laying cables will start after the poles have been erected." |
| AllIsWell | Mega Block For Works To Eliminate Unmanned Railway Level Crossings on Bibinagar-Nadikude Section Div on : September 15, 2013 - 20:56:46 PM |
|
In viewof launching of boxes for eliminating unmanned railway level crossings between Pagidipalli and Nagireddipalli & Vishnupuram and Pondugula stations on Bibinagar-Nadikude Section, the following trains will be diverted / cancelled / partially cancelled between 23rd September and 2ndOctober, 2013 as mentioned. |
| eabhi200k | Mega Block For Works To Eliminate Unmanned Railway Level Crossings on Bibinagar-Nadikude Section Div on : September 15, 2013 - 20:56:55 PM |
|
In viewof launching of boxes for eliminating unmanned railway level crossings between Pagidipalli and Nagireddipalli & Vishnupuram and Pondugula stations on Bibinagar-Nadikude Section, the following trains will be diverted / cancelled / partially cancelled between 23rd September and 2ndOctober, 2013 as mentioned. |
| Mafia | यार्ड सुरक्षा में 30 फीसद सुधार की जरूरत on : September 15, 2013 - 21:00:10 PM |
|
जागरण संवाददाता, वाराणसी : कैंट रेलवे स्टेशन व उसका यार्ड, सेफ्टी में मामले में 70 फीसद सही पाया गया जबकि 30 प्रतिशत सुधार की जरूरत है। सभी प्वाइंटों का आडिट करने के बाद शुक्रवार को नई दिल्ली से आए उत्तर रेलवे के मुख्य संरक्षा अधिकारी सीबीके सिंह ने यह जानकारी दी। |
| RailXpert | Konkan Railway installs bio-toilets on : September 15, 2013 - 21:00:16 PM |
|
INDIA: Konkan Railway has begun equipping its stations with 'bio-toilets' which used anaerobic biodigester technology developed by the Defence Research & Development Organisation for use in remote areas. |
| ConfirmTicket | Chaos after woman comes under moving train on : September 15, 2013 - 21:00:27 PM |
|
Traffic on Mysore-Nanjangud railway line came to a standstill for more than one hour due to a protest against an accident which claimed the legs of a woman who fell under a train.Rathnamma (59), a native of Thandavapura, suffered grievous injuries and was shifted to K R Hospital.She had come to her daughter’s house in Badanaval village and was at the railway station to board a train to Chamarajnagar when she lost balance, slipped and fell under the Chamarajnagar-Mysore passenger train. She lost both her legs though passengers tried to pull the emergency chain to stop the moving train.Enraged, villagers and passengers accused the driver and staff of callousness and sat on the track in protest, blocking traffic for more than 90 minutes. They also demanded compensation for her from the Railways.The Railway police refused to accept their complaint. The train was finally allowed to leave at 3.10 pm. |
| eabhi200k | MP bats for Karimnagar-Secunderabad railway link on : September 16, 2013 - 00:00:28 AM |
|
Local MP Ponnam Prabhakar said that he was striving hard for the sanctioning of the railway line between Karimnagar and Secunderabad via Siddipet or Karimnagar to Secunderabad via Hasanparthi routes. |
| nikhilndls | South East Central Railway (SECR) changes platform on : September 15, 2013 - 21:00:32 PM |
|
South East Central Railway (SECR) changes platform numbers at Gondia railway station. From Thursday, platform number 3 will become platform number 7. Earlier, this platform was rechristined as platform number 4A. |
| irmafia | Mega Block For Works To Eliminate Unmanned Railway Level Crossings on Bibinagar-Nadikude Section Div on : September 15, 2013 - 21:00:40 PM |
|
In viewof launching of boxes for eliminating unmanned railway level crossings between Pagidipalli and Nagireddipalli & Vishnupuram and Pondugula stations on Bibinagar-Nadikude Section, the following trains will be diverted / cancelled / partially cancelled between 23rd September and 2ndOctober, 2013 as mentioned. |