railgenie | RDSO inspection throws Metro Reach 3 off the rails on : September 03, 2013 - 20:00:11 PM |
Bengaluru: While Namma Metro is conducting integrated tests on the 9.9-km-long stretch from Swastik in Malleswaram to Peenya (Reach-3 and 3A), the final clearances for starting the line rests on the clearances on Schedule of Dimension of the track.It is learnt that the Research Design and Standards Organisation (RDSO) has sent a letter to Bangalore Metro Rail Corporation Ltd seeking the specifications on 'track alignment.’The BMRCL is conducting the trials on reach 3 and 3A. But the final clearance depends on the schedule of dimension from the RDSO as only then can BMRCL approach the Commissioner of Metro Rail Safety to conducting oscillation trials. A letter has been sent to the RDSO, requesting its team to conduct the inspection.But, according to RDSO officials, the team that was studying the report sent by BMRCL has ‘raised a few objections’ and has asked the BMRCL to furnish specific details on the ‘track alignment’. |
Mafia | STING OPERATION of Police Extortion in train on : September 03, 2013 - 20:00:18 PM |
गोरखपुर. गरीब हर जगह कुचला जाता। गरीबी अभिशाप है। ऐसा आपने हर जगह सुना होगा। यदि इसका साक्षात नमूना देखना हो तो गोरखपुर से होकर गुजरने वाली अवध आसाम एक्सप्रेस या जनसेवा एक्सप्रेस के जनरल क्लास में सफ़र करके देखिये, गरीबी वाकई आपको अभिशाप लगने लगेगी। इसका एहसास आपको कराएंगे खाकी वर्दीधारी जीआरपी के सिपाही जो बदकिस्मती से यात्रियों की सुविधा के लिए तैनात हैं। ये वर्दीधारी गुंडे यात्रियों से उनकी पहचान और पैसे दोनों छीन लेते हैं। इनकी बेशर्मी और गुंडई का आलम यह है कि न तो जीआरपी का कोई अफसर और न रेलवे के बड़े अधिकारी, इनके खिलाफ कोई भी एक्शन लेने को तैयार नहीं हैं। यात्रियों ने दैनिकभास्कर.कॉम के रिपोर्टर को इस बात की सूचना दी थी कि जीआरपी के सिपाही अवैध तरीके से अवध आसाम और जनसेवा एक्सप्रेस के जनरल क्लास के डिब्बे में घुसकर यात्रियों से मारपीट करते हैं और पहचान पत्र दिखाने के नाम पर अवैध वसूली कर रहे है। हमने इसकी तस्दीक करने की ठानी। इसके लिए हमने अवध आसाम एक्सप्रेस अप और डाउन दोनों में रियलिटी चेक किया। नतीजा सामने था, यात्रियों को न केवल मारापीटा जाता है बल्कि उन्हें बेईज्जत कर ट्रेन से उतार भी दिया जाता है। कई बार तो ये खाकी वर्दी के जल्लाद उत्तर प्रदेश और बिहार के छोटे शहरों से दिल्ली और हरियाणा के शहरों में मजदूरी करने वालों से उनका पहचान पत्र और जर्नी का टिकट छीनकर भाग चुके है। |
irmafia | Construction of track bed for railway to start after festivals on : September 03, 2013 - 20:56:24 PM |
KATHMANDU : The government has planned to start work on the track bed of the East West Electrical Railway after the festive season ends in November. On Monday, it invited tenders for the construction of the track bed on a 5-km stretch of the Simara-Bardibas section of the proposed railway . The track bed is the foundation on which the railway track will be laid.The Department of Railways said that it would select three contractors within the next two months to construct the track bed in three packages. As per the plan, the contractors will have to start work immediately after the festivals based on the detailed project report (DPR) readied by South Korean consultants.The DPR of the 108-km Simara-Bardibas section of the East-West Railway was completed last year. “Construction of the track bed will cost Rs 500 million,” said Rajeshwor Man Singh, superintendent engineer of the department.The scope of the tender issued for the track bed includes construction of cross drainage structures, animal crossings, underpasses, embankments, earthen drains and bio-engineering works. However, even though the tender notice has been published, the exact locations where the track bed will be constructed have not been finalised yet. |
puneetmafia | TEMPORARY AUGMENTATION OF NEW DELHI- BHUBANESHWAR RAJDHANI EXPRESS TRAINS on : September 03, 2013 - 20:56:39 PM |
03-09-2013 |
railenquiry | Hyderabad, Kakinada special trains on September 6 on : September 03, 2013 - 20:56:58 PM |
The South Central Railway (SCR) will run special trains to clear extra rush of passengers. |
messanger | DIVERSION OF DIBRUGARH TOWN- NEW DELHI RAJDHANI TRAINS DUE TO ‘RAIL & ROAD BLOCKADE’ BETWEEN PATHSAL on : September 03, 2013 - 20:57:09 PM |
03-09-2013 |
railenquiry | रेलवे ने ट्रस्ट की माँगों पर लगाई मुहर : गर्ग on : September 03, 2013 - 20:57:45 PM |
महाराजा अग्रसेन वेलफेयर ट्रस्ट, पंचकूला ने उसके द्वारा उठाई गई ज्यादातर मागों पर सरकार द्वारा जल्द ही कार्य शुरू कराने के आश्वासन पर सांसद पवन कुमार बंसल का धन्यवाद किया और उन्हे एक 'धन्यवाद पत्र' देने का निर्णय लिया है। |
nikhilndls | Eastern Railway passenger earnings up 12% during April-July | Business Line on : September 03, 2013 - 21:00:06 PM |
Eastern Railway posted a 12 per cent growth in passenger earnings to nearly Rs 636 crore between April and July this year, as against a little more than Rs 567 crore during the year-ago period. |
puneetmafia | Construction of track bed for railway to start after festivals on : September 03, 2013 - 21:00:11 PM |
KATHMANDU : The government has planned to start work on the track bed of the East West Electrical Railway after the festive season ends in November. On Monday, it invited tenders for the construction of the track bed on a 5-km stretch of the Simara-Bardibas section of the proposed railway . The track bed is the foundation on which the railway track will be laid.The Department of Railways said that it would select three contractors within the next two months to construct the track bed in three packages. As per the plan, the contractors will have to start work immediately after the festivals based on the detailed project report (DPR) readied by South Korean consultants.The DPR of the 108-km Simara-Bardibas section of the East-West Railway was completed last year. “Construction of the track bed will cost Rs 500 million,” said Rajeshwor Man Singh, superintendent engineer of the department.The scope of the tender issued for the track bed includes construction of cross drainage structures, animal crossings, underpasses, embankments, earthen drains and bio-engineering works. However, even though the tender notice has been published, the exact locations where the track bed will be constructed have not been finalised yet. |
eabhi200k | DIVERSION OF DIBRUGARH TOWN- NEW DELHI RAJDHANI TRAINS DUE TO ‘RAIL & ROAD BLOCKADE’ BETWEEN PATHSAL on : September 03, 2013 - 21:00:15 PM |
03-09-2013 |
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|