| messanger | फंसे लोगों को देहरादून, हरिद्वार व ऋषिकेश से लाने के कोर्ट के पिछले आदेश के बाद कितनी विशेष ट्रेनें on : June 29, 2013 - 11:30:11 AM |
|
ग्वालियर. उत्तराखंड आपदा में फंसे तीर्थयात्रियों के लिए केंद्र सरकार ने क्या-क्या राहत कार्य किए हैं, शपथ-पत्र के साथ इसकी रिपोर्ट पेश की जाए। फंसे लोगों को देहरादून, हरिद्वार व ऋषिकेश से लाने के कोर्ट के पिछले आदेश के बाद कितनी विशेष ट्रेनें चलाईं गईं, उत्तर मध्य रेलवे जोन प्रशासन इसकी कम्प्लायंस (क्रियान्वयन) रिपोर्ट पेश करे। |
| Jitendar | Kanpur Central subway waterlogged on : June 29, 2013 - 03:30:03 AM |
|
KANPUR: The heavy rainfall led to waterlogging in the sub-way at Kanpur Central Railway Station. The passengers could not use the tunnel. This gave them tough time as they had the only option of using the rail overbridge. Waterlogging was also witnessed on the tracks. |
| ConfirmTicket | Rail link to boost Kashmir development, says Singh on : June 29, 2013 - 03:30:24 AM |
|
Prime Minister Manmohan Singh on Wednesday opened India’s longest rail tunnel in Kashmir to provide a key link between the Kashmir Valley and Jammu region, even as UPA chairperson Sonia Gandhi said that Kashmiris were fed up with violence. |
| puneetmafia | Delhi-Chennai Duronto Express passengers forced to get down as TTE rejects SMS ticket confirmation on : June 29, 2013 - 03:30:29 AM |
|
The next time, better not treat the PNR status generated by 139 centralised railways enquiry service as gospel.This was the lesson a group of IIT-M researchers learnt the hard way when they were offloaded from the Delhi-Chennai Duronto Express on June 18 because the automated text message on their mobile phone showing confirmed seats did not tally with the final reservation charts that declared the tickets as wait-listed.The group of seven, including researchers and students, were returning from Delhi after attending a workshop at the IIT-Mandi on text-to-speech synthesis technology for the visually challenged.“We had booked two sets of tickets almost two months in advance. Though they were initially wait-listed, we got the automated SMS from 139 a few hours before departure in which some tickets were confirmed and the rest were RAC,” said Anusha, who is a research associate on a text-to-speech synthesis project under way at IIT-M. |
| RailXpert | रेल्वेगाड्या विलंबाने on : June 29, 2013 - 03:30:41 AM |
|
नागपूर, ता. 27 ः राज्यात सुरू असलेल्या जोरदार पावसाचा फटका रेल्वे वाहतुकीला बसला. परिणामी सुमारे डझनभर गाड्या निर्धारित वेळेपेक्षा उशिराने धावत आहेत. गाडी क्रमांक 12589 गोरखपूर-सिकंदराबाद एक्स्प्रेस 3 तास 50 मिनिटे, 07004 कोटा-हैदराबाद 4 तास, 12724 एपी एक्स्प्रेस दोन तास, 18405 पुरी-अहमदाबाद 2 तास 45 मिनिटे, 12670 गंगा कावेरी एक्स्प्रेस 2 तास, 12722 दक्षिण एक्स्प्रेस 1 तास, आणि 12512 राप्तीसागर एक्स्प्रेस सुमारे तासभर उशिराने धावत आहे. |
| nikhilndls | Rs 3.71 Lakh Penalty Realized From Ticketless Travellers in Special Surprise Road Checks in June 201 on : June 29, 2013 - 03:30:45 AM |
|
Rs 3.71 Lakh Penalty Realized From Ticketless Travellers in Special Surprise Road Checks in June 2013 |
| railgenie | Rs 3.71 Lakh Penalty Realized From Ticketless Travellers in Special Surprise Road Checks in June 201 on : June 29, 2013 - 03:30:53 AM |
|
Rs 3.71 Lakh Penalty Realized From Ticketless Travellers in Special Surprise Road Checks in June 2013 |
| eabhi200k | Kanpur Central subway waterlogged on : June 29, 2013 - 04:00:24 AM |
|
KANPUR: The heavy rainfall led to waterlogging in the sub-way at Kanpur Central Railway Station. The passengers could not use the tunnel. This gave them tough time as they had the only option of using the rail overbridge. Waterlogging was also witnessed on the tracks. |
| railenquiry | Soon, trains to run under electric traction on Dindigul-Virudhunagar stretch - The Times of India on : June 29, 2013 - 06:00:28 AM |
|
MADURAI: With electrification work having been completed on the Dindigul - Virudhunagar section, the railways may consider operating trains with electric locomotives sometime from July after authorisation from the commissioner of railway safety (CRS), who will be inspecting the section anytime soon. The electric traction work between Dindigul and Virudhunagar railway stations in the Madurai division were completed reportedly in April and the section is charged with 25 KV power from the sub-stations and awaiting the inspection of CRS, railway authorities said. |
| railgenie | Valley rail tunnel link to boost progress, says PM Manmohan Singh on : June 29, 2013 - 06:00:37 AM |
|
Days after eight soldiers were killed in a militant attack, Prime Minister Manmohan Singh and Congress president Sonia Gandhi strongly reaffirmed the government's commitment to Kashmir's development as they opened a historic train tunnel link that connects the Valley to the Jammu region."People here are fed up of bloodshed. The youth here want jobs. The UPA wants Kashmir's future to be written with secularism, development and democracy, where problems are solved through dialogue," Sonia said at the ceremony at Banihal station to flag off the first train on the route.It was the first visit to the state by Singh and Sonia after Parliament attack convict Afzal Guru was hanged. About 10,000 security personnel were deployed in the town for the high-profile event that was held under the shadow of terror."Today, we begin a new chapter in Jammu and Kashmir. Through this rail link, Kashmir will eventually have an all-weather connect with the outside world. Even its remotest, backward regions will have equal opportunities. There will be development in tourism, handicrafts and other industries," Sonia said referring to the link which will reduce travel time on the stretch by over one hour.The 17.5 km link between Banihal in Jammu and Qazigund in the Valley is the first all-weather route between the two regions. Cited as the UPA's flagship project to showcase its reconstruction of Jammu and Kashmir, the stretch has a 11-km-long tunnel through the mighty Pir Panjal range.The only existing link on this route, the Jawahar Tunnel meant for road transport and opened in 1965, gets blocked in winter due to heavy snow. The rail tunnel runs 300 metres below Jawahar Tunnel and is shielded from the harsh winter.The line between Banihal and Qazigund has reduced the 35-km road journey to 17.5 km by rail. It also promises economical and faster transportation of goods, food grains and fuel to the Valley."I would ask railways to complete the remaining work of the Kashmir link as early as possible so that we can connect Kashmir with the development process in the rest of the country," Singh said after flagging off the first train. |
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|
