| irmafia | Youths robbed after falling unconscious at station on : July 04, 2013 - 00:01:24 AM |
|
Bathinda: |
| railgenie | 20 express trains, 2 new AC trains on track soon on : July 04, 2013 - 00:01:23 AM |
|
Chennai: Twenty express trains and two new air-conditioned express trains besides four passenger trains would be introduced shortly.Three new MEMUs and extension of five express trains have also been proposed in the Southern Railway zone Time Table-July 2013 released here recently. The new MEMU service would include daily Chennai-Tirupati connectivity. Train no: 66011 will leave Central at 9.30am and reach Tirupati at 1.10pm. Train no: 66012 will leave Tirupati at 9.10 pm and reach Central at 5.20pm.Also, Chennai Egmore- Madurai portion of Train No.16127/16128 (Chennai Egmore - Guruvayur Daily Express) would be extended to Tuticorin as Train No.16129/16130. Likewise, Chennai Egmore-Tiruchy (train No.12605/12606 ) 'Pallavan' Exp has been extended to Karaikudi.Mangalore Central- Tiruchchirappalli (Train No.12653/12654 Weekly express) would be extended up to Puducherry via Vriddhachalam, Villupuram as Train No.16857/16858.Rly |
| chotelal | Sirsa-Ludhiana passenger train to be made regular, says Sirsa MP on : July 04, 2013 - 00:01:20 AM |
|
Sirsa: |
| railenquiry | 20 express trains, 2 new AC trains on track soon on : July 04, 2013 - 00:01:19 AM |
|
Chennai: Twenty express trains and two new air-conditioned express trains besides four passenger trains would be introduced shortly.Three new MEMUs and extension of five express trains have also been proposed in the Southern Railway zone Time Table-July 2013 released here recently. The new MEMU service would include daily Chennai-Tirupati connectivity. Train no: 66011 will leave Central at 9.30am and reach Tirupati at 1.10pm. Train no: 66012 will leave Tirupati at 9.10 pm and reach Central at 5.20pm.Also, Chennai Egmore- Madurai portion of Train No.16127/16128 (Chennai Egmore - Guruvayur Daily Express) would be extended to Tuticorin as Train No.16129/16130. Likewise, Chennai Egmore-Tiruchy (train No.12605/12606 ) 'Pallavan' Exp has been extended to Karaikudi.Mangalore Central- Tiruchchirappalli (Train No.12653/12654 Weekly express) would be extended up to Puducherry via Vriddhachalam, Villupuram as Train No.16857/16858.Rly |
| riteshexpert | Cabinet nod likely for high-speed rail in NCR on : July 04, 2013 - 00:00:59 AM |
|
The Centre’s ambitious plan to run high-speed bullet trains on dedicated tracks connecting Delhi with its adjoining satellite towns of Meerut, Panipat and Alwar in less than half the time that it takes now, seems to be slowly inching towards reality. The Union Cabinet on Wednesday is likely to approve the setting up of a company —National Capital Region Transport Corporation (NCRTC) — to execute the Rapid Rail Transit System (RRTS) with an initial fund of R100 crore. Delhi, Haryana, Uttar Pradesh and Rajasthan which are part of the NCR, will contribute 50% of the R100 crore.As of now, three corridors of the RRTS have been finalised. These include Delhi-Meerut, Delhi-Panipat and Delhi-Alwar. The project will cost R75,000 crore. As part of this, new broad gauge tracks would be laid in Delhi and its three neighbouring states on which the high-speed air -conditioned trains would run. It would cover a distance of 90 km between Delhi and Meerut in 63 minutes, Delhi and Alwar (188 km) in 117 minutes and Delhi and Panipat (109 km) in 61 minutes. |
| puneetmafia | Cabinet nod likely for high-speed rail in NCR on : July 04, 2013 - 00:00:58 AM |
|
The Centre’s ambitious plan to run high-speed bullet trains on dedicated tracks connecting Delhi with its adjoining satellite towns of Meerut, Panipat and Alwar in less than half the time that it takes now, seems to be slowly inching towards reality. The Union Cabinet on Wednesday is likely to approve the setting up of a company —National Capital Region Transport Corporation (NCRTC) — to execute the Rapid Rail Transit System (RRTS) with an initial fund of R100 crore. Delhi, Haryana, Uttar Pradesh and Rajasthan which are part of the NCR, will contribute 50% of the R100 crore.As of now, three corridors of the RRTS have been finalised. These include Delhi-Meerut, Delhi-Panipat and Delhi-Alwar. The project will cost R75,000 crore. As part of this, new broad gauge tracks would be laid in Delhi and its three neighbouring states on which the high-speed air -conditioned trains would run. It would cover a distance of 90 km between Delhi and Meerut in 63 minutes, Delhi and Alwar (188 km) in 117 minutes and Delhi and Panipat (109 km) in 61 minutes. |
| irmafia | Come clear on Havelock bridge, MP, MLA told on : July 04, 2013 - 00:00:41 AM |
|
All-party members hold meet on the burning issue |
| greatindian | SWR collects relief materials for stranded pilgrims on : July 04, 2013 - 00:00:30 AM |
|
The Bharat Scouts and Guides (BS&G) of South Western Railway (SWR) has started collecting flood relief materials from the railway staff in Hubli, Bangalore and Mysore, to help the people stranded in Uttarakhand. |
| irmafia | Railway: New timetable comes into force on : July 04, 2013 - 00:00:53 AM |
|
Railway: New timetable comes into force |
| riteshexpert | कोकणात पावसाचे थैमान कोकण रेल्वे ठप्प on : July 04, 2013 - 00:01:57 AM |
|
गेले काही दिवस फक्त हजेरी लावणाऱ्या पावसाने कोकणात मंगळवारी मात्र थैमान घातले. दिवसभर पडणाऱ्या मुसळधार पावसाने मुंबईहून कोकणात जाण्याचे दोन मार्ग बंद पाडले. कोकण रेल्वेवर आरवली व संगमेश्वर या दोन स्थानकांदरम्यान रुळांवर माती आल्याने कोकण रेल्वेची वाहतूक काही काळ बंद ठेवण्यात आली होती. रात्री उशिरापर्यंत या परिस्थितीत बदल झाला नव्हता. दुसऱ्या बाजुला मुंबई-गोवा महामार्गावर चिपळूणच्या हद्दीत वरसगावजवळ पिट ढवळी नदीला आलेल्या पुराने वाहतूक बंद पडली. मंगळवारच्या पावसाने कोकण तसेच तळकोकण या भागाला झोडपून काढले. परिणामी कोकणात संगमेश्वरजवळील शास्त्री नदी, चिपळूणजवळील पिट ढवळी नदी यांना पूर आल्याने काही पूल पाण्याखाली गेले व वाहतूक बंद पडली. यामुळे गोव्याकडे जाणारी वाहतूक बहादूर शेख नाका येथून कुंभार्ले घाटातून कोल्हापूरमार्गे गोव्याकडे वळवण्यात आली. तर मुंबईला येणारी वाहने याच मार्गाने गोव्याच्या दिशेने येतील. कोकण रेल्वेला गेल्या दोन वर्षांमध्ये अनेकदा दरड कोसळण्याचा सामना करावा लागला होता. यंदा मात्र तशी वेळ अद्याप आलेली नाही. पण मंगळवारच्या पावसाने संगमेश्वर व आरवली या दोन स्थानकांदरम्यान माती कोसळल्याने वाहतूक ठप्प झाली. मंगळवारी रात्री उशिरापर्यंत ही माती बाजूला करण्याचे काम चालू होते. मात्र तंत्रज्ञांकडून 'ट्रॅक क्लिअरन्स' प्रमाणपत्र मिळेपर्यंत या मार्गावरील वाहतूक पूर्ववत होणार नाही, असे कोकण रेल्वेच्या वैशाली पतंगे यांनी सांगितले. |
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|
