RailEnquiry

Loading..

43801 - Chennai Beach - Arakkonam Emu Delay Graph for Annanur Station

43801 Chennai Beach - Arakkonam Emu - Annanur (ANNR) Station Delay History

Date RangeAvg. Delay
Stats Date range: 22 May, 2024 to 17 Nov, 2024

43801 - Chennai Beach - Arakkonam Emu Running History

Late | Right Time
Chennai Beach
7%
93%
Royapuram
50%
50%
Washermanpet
52%
48%
Vyasarpadi Jeeva
0%
100%
Perambur
3%
97%
Perambur Carriage Works
0%
100%
Perambur Loco Works
0%
100%
Villivakkam
16%
84%
Korattur
0%
100%
Pattaravakkam
0%
100%
Ambattur
24%
76%
Tirumullaivayil
0%
100%
Annanur
0%
100%
Avadi
73%
27%
Hindu College
0%
100%
Pattabiram
13%
87%
Nemilicherry Halt
0%
100%
Tiruninravur
76%
24%
Veppampattu
0%
100%
Sevvapet Road
0%
100%
Putlur Halt
0%
100%
Tiruvallur
30%
70%
Egattur
0%
100%
Kadambattur
37%
63%
Senji Panambakkam
0%
100%
Manavur
0%
100%
Tiruvalangadu
51%
49%
Mosur
0%
100%
Puliyamangalam
0%
100%
Arakkonam
29%
71%
Stats Date range: 22 May, 2024 to 17 Nov, 2024

43801 Chennai Beach - Arakkonam Emu News

Change in pattern of Suburban train services between Chennai Beach and Korukkupet
To facilitate engineering works between Chennai Beach and Korukkupet, Southern Railway will impose rail traffic block from May 23 to June 22. This will affect pattern of sub-urban train services as per details -

Train number 43801 ...
22 May,2018
Change in pattern of suburban train services Chennai – Arakkonam section

To facilitate engineering works between Pattabiram – Sevvapet Road in Chennai – Arakkonam section, change will be made in the pattern of suburban train service on July 15, 2017, Saturday as per details -

Train number 43801 Chennai Beac...

15 Jul,2017
Power and Line block in Chennai – Arakkonam section

To facilitate engineering works between Pattabiram West Siding – Tiruninravur in Chennai – Arakkonam section Southern Railways has imposed a line and power block in this section. Due to this there will be change in pattern of train and subu...

04 Mar,2017