North bridge: Trial run soon by RailXpert on 30 November, 2012 - 08:00 AM | ||
---|---|---|
RailXpert | North bridge: Trial run soon on 30 November, 2012 - 08:00 AM | |
Trial run of vehicles through lane one and four of the North overbridge will begin in another three to four days.DMRC sources said they are coordinating with the traffic police on how best to divert traffic through the newly-constructed lanes. Speed limits will be in place and sign boards will soon be installed.The 3.30 metres wide lanes will be further widened when the lanes at the centre – lanes 2 and 3 are rebuilt. The deadline set to build the metro-rail’s pillars at the centre is September 2013. |