| Mafia | Rishikesh-Karanprayag rail project govt’s top priority: CM on : September 22, 2013 - 21:00:04 PM |
|
Dehradun: Uttarakhand is taking up Rishikesh-Karanprayag railway project on priority and will shortly appoint a Nodal Officer for the project.This was disclosed by Uttarakhand Chief Minister Vijay Bahuguna at the Rishikesh-Karanprayag railway project meeting. He also asked Satish Agnihotri, Managing Director, Rail Vikas Nigam Limited, to ensure that the project is completed within the stipulated time.Bahuguna said the state government was fully committed to see that the project was undertaken speedily and completed well within the given time. All the problems and challenges being faced by the Rail Vikas Nigam Limited should be brought to the state’s knowledge for their early redressal, he added.He said the government officials had been directed to ensure close coordination with the Nigam officials. The CM also held that the land transfer cases linked to the project must be dealt on priority. |
| ConfirmTicket | हसडीहा तक फिर ट्रेन | PrabhatKhabar.com : Hindi News Portal to Eastern India on : September 22, 2013 - 20:56:42 PM |
|
भागलपुर/ बांका: झारखंड के सरैयाहाट के पास 14 सितंबर को स्थानीय लोगों ने हॉल्ट को लेकर ट्रेन पर पथराव किया. लोगों ने चालक व गार्ड को बंधक बनाया व यात्रियों के साथ अभद्र व्यवहार किया. इस घटना पर डीआरएम ने इस मार्ग पर रेल सेवा रोक दी थी. |
| nikhilndls | Pre-launch run of train to Delhi on Tuesday on : September 22, 2013 - 20:56:21 PM |
|
NASHIK: The pre-launch run of the Rajdhani-like, fully air-conditioned train from Mumbai to Delhi via Nashik, on Central Railway, has been scheduled for Tuesday. |
| greatindian | Suburban rail in two years on : September 22, 2013 - 20:56:06 PM |
|
Kochi: A suburban rail service can become a reality in a mere two years unlike the high-speed rail corridor and similar projects, but to be feasible it has to cover the whole of the state, strongly feels Mr C. Raju, a former Chief Engineer of Konkan Railways and General Manager, Rites.“We would need to install Automatic Block Signalling (ABS) every one kilometer on the existing rail line to enable more trains to run on the same track. However, the current section selected -Thiruvananthapuram-Haripad-Chengannur - is not ideal as the Shoranur-Ernakulam section is the most congested in the state with six lines from Mangalore and Palakkad merging into two here,” he explains.Raju, who had first raised the demand for a suburban service over a decade ago, suggests the feasibility study should cover all three metropolitan cities of Kozhikode, Kochi and Thiruvananthapuram, and not just the section running upto Chengannur. In his view, going in for ABS technology may prove cost effective. “The cost could be around Rs 25 lakh per km and not Rs 20 crore as is being suggested. The main expense will be for converting the level crossing into a RoB or subway. This has to be executed anyway considering future traffic,” he adds. |
| greatindian | One Coach of Train No.12666 Kanyakumari – Howrah Express Derailed Between Sri Venkateshwarapalem and on : September 22, 2013 - 20:56:00 PM |
|
One Coach of Train No.12666 Kanyakumari – Howrah Express Derailed Between Sri Venkateshwarapalem and Kavali Stations on Gudur – Vijayawada Section of Vijayawada Division |
| puneetmafia | Coach Factory at Sonia’s constituency prooving to be White Elephant for Railways on : September 22, 2013 - 20:55:47 PM |
|
Coach Factory at Sonia’s constituency proving to be White Elephant for Railways |
| greatindian | Rishikesh-Karanprayag rail project govt’s top priority: CM on : September 22, 2013 - 20:55:38 PM |
|
Dehradun: Uttarakhand is taking up Rishikesh-Karanprayag railway project on priority and will shortly appoint a Nodal Officer for the project.This was disclosed by Uttarakhand Chief Minister Vijay Bahuguna at the Rishikesh-Karanprayag railway project meeting. He also asked Satish Agnihotri, Managing Director, Rail Vikas Nigam Limited, to ensure that the project is completed within the stipulated time.Bahuguna said the state government was fully committed to see that the project was undertaken speedily and completed well within the given time. All the problems and challenges being faced by the Rail Vikas Nigam Limited should be brought to the state’s knowledge for their early redressal, he added.He said the government officials had been directed to ensure close coordination with the Nigam officials. The CM also held that the land transfer cases linked to the project must be dealt on priority. |
| irmafia | At Metro event, Cong derails Narendra Modi on : September 22, 2013 - 20:00:17 PM |
|
At the launch of underground Metro project, Congress leaders flay Gujarat CM's development agenda, promote policies of Centre & state govt. |
| railgenie | Pre-launch run of train to Delhi on Tuesday on : September 22, 2013 - 21:00:39 PM |
|
NASHIK: The pre-launch run of the Rajdhani-like, fully air-conditioned train from Mumbai to Delhi via Nashik, on Central Railway, has been scheduled for Tuesday. |
| eabhi200k | To prevent accidents, Railways pondering automatic doors in AC coaches on : September 22, 2013 - 20:00:06 PM |
|
Railways is mulling installing automatic doors in AC coaches of some premier trains, on the lines of those in Metro, to enhance passengers' safety and check criminal activities on board running trains.The new system will be controlled by the driver or guard from his cabin and with his command, all the doors will automatically open when train arrives at station, and close when it departs. Currently, train doors are opened and closed manually."Train will not move unless all the doors are closed in the automatic door system. The driver and the guard will have command control of the system at their cabins," a senior Railway Ministry official said.A meeting of the Railway Board was held last week to finalise the proposal for introducing automatic doors system in trains."RDSO (Research Design and Standards Organisation) is finalising the specifications for the system to be fitted in a rake of 20 AC coaches in the Rail Coach Factory at Kapurthala as a pilot project," the official said.However, the official said, "Before equipping the first rake with the system, a non-AC coach in Delhi Division will be made operational with the automatic closing door system for trial purpose."Several lives have been lost with passengers falling off running trains while standing on foot-board.According to the official, Allahabad High Court had directed Railways to instal automatic doors in passenger coaches to prevent passengers from falling off running trains.Railways had appealed to the Supreme Court against the order, but the apex court had upheld the High Court decision.Railways is planning to instal the automatic door system in all mail and express trains."The system is being considered as more safe in long-distance super fast trains to ensure foolproof safety to passengers. Besides, the new system will also help in curbing criminal activities on running trains," the official said.Besides Metro trains, high speed trains in foreign countries have automatic doors in each coach."It has been noticed that passengers travel on foot-board or standing at door while undertaking journey by trains though it is not permitted. So, the proposed system will be effective in checking mishaps and criminal activities on running trains," he said.As Railways is actively considering to increase speed of passengers trains, the new technology of automatic doors is expected to be installed in all such trains. |