ACD version - 2 in IR by irmafia on 05 May, 2012 - 04:00 AM | ||
---|---|---|
irmafia | ACD version - 2 in IR on 05 May, 2012 - 04:00 AM | |
Anti Collision Devices (ACD) has been provided as a pilot project covering 1736 Route Kilometers and 548 Locomotives on Northeast Frontier Railway (NFR). Based on the experience of the NFR, the specifications and design configuration were revised and the system as evolved was tried on the electrified multiple lines automatic signalling section of the Southern Railway in 2010-11. |