LINE BLOCK / POWER BLOCK by eabhi200k on 06 September, 2013 - 02:56 PM | ||
---|---|---|
eabhi200k | LINE BLOCK / POWER BLOCK on 06 September, 2013 - 02:56 PM | |
Due to line block / power block, to facilitate engineering works at Karunguzhi in Chengalpattu – Tindivanam section, the following changes will be made in train services from 06.09.2013 to 08.09.2013. |