| railgenie | Railways gives green signal to hi-tech security plan for Charbagh station on : July 04, 2013 - 18:00:47 PM |
|
LUCKNOW: The leisurely entry at Charbagh station would be restricted in the coming months as the place would be equipped with a multiple security check system.Railways has given its nod to Integrated Security System (ISS), a hi-tech security infrastructure, for Charbagh. It would ensure airport like security at the railway station. "Funds have been sanctioned and tendering will start soon," said senior DCM, Northern Railway, Lucknow, Ashwini Srivastava. ISS will be installed at the main Charbagh station as well as Lucknow Junction.The Integrated Security System will cover entry/exit points, circulating area, concourse, all platforms, parcel area, PRS (reservation buildings), foot-over-bridges, yard pit shed, washing line, station limit (home signal to home signal) and vehicle entry point (to record vehicle number plate and vehicle details).ISS has to be implemented at 140 railway stations identified as "sensitive" across the country. Charbagh, too, falls under this category. ISS is a multi-pronged security system which will be least intrusive. In 2010, Railway Board had announced implementing ISS at railway stations but it failed to take off due to shortage of funds. But, now that funds have been sanctioned, the process would begin soon. Railways will start floating tenders to put the needed paraphernalia in place. ISS will take the level of security several notches higher from the existing one. The concept is to have multiple checking system -- starting from entry to station premises and continuing till boarding of the train. |
| eabhi200k | मोबाइलवरून आरक्षणाला प्रतिसाद on : July 04, 2013 - 18:00:37 PM |
|
नागपूर |
| nikhilndls | Delhi-Patna AC superfast train run extended on : July 04, 2013 - 18:00:22 PM |
|
PATNA: Railways has extended the run of New Delhi-Patna AC superfast train up to July 16 while New Delhi -Darbhanga summer special train will now run up to July 14. Similarly Haridwar-Muzaffarpur summer special train will run up to July 16, ECR CPRO Amitabh Prabhakar said. |
| railgenie | Sangamitra Exp. augmented by AC & SL Coach on : July 04, 2013 - 18:00:11 PM |
|
Sangamitra Exp. augmented by AC & SL Coach |
| railenquiry | Railways Arrangements for Rath Yatra – 2013 on : July 04, 2013 - 18:00:14 PM |
|
For the convenience of pilgrims and passengers and to cater to extra rush of passengers during Rath Yatra Festival at Puri, East Coast Railway has decided to run special trains from different parts of Odisha, West Bengal and Andhra Pradesh excluding the existing trains coming to Puri. Special trains will also run to and from Puri to clear extra rush on the occasion of Sandhya Darshan, Bahuda Yatra and Sunavesa. Apart from this, six trains will be rescheduled, five to be diverted and six to be extended to Puri. ECoR has arranged exclusive passenger amenities for the convenience of the passengers. |
| ConfirmTicket | Sangamitra Exp. augmented by AC & SL Coach on : July 04, 2013 - 18:00:04 PM |
|
Sangamitra Exp. augmented by AC & SL Coach |
| irmafia | Construction work paced up at Patalpani-Kalakund meter gauge on : July 06, 2013 - 15:00:08 PM |
|
INDORE: Ratlam division officials here on Friday paced up the construction work on the track on Patalpani- Kalakund meter gauge, which was damaged and blocked due to landslide during the heavy rains in the last 48 hours.Two trains are being run on this route between Choral and Khandwa, while another two were run between Khandwa and Akola. Earlier, on Thursday, trains were cancelled on the route due to the damage. Officials informed that a stretch of 25km of track was severely damaged and trains on the route had to be stopped. A team was immediately sent for construction work.According to railway sources, more than 250 labourers were deployed on the job. A lot of water was accumulated on the tracks. Additional divisional railway manager Sanjay Agrawal, Ratlam division engineer Yogesh Sharma and Rajkumar and other officials took immediate action and supervised the work within 24 hours of the damage.Major trains which were cancelled on Friday were Mhow Khandwa special, Akola- Mhow passenger. On Saturday, Mhow-Akola passenger and Ujjain-Khandwa passenger trains have been cancelled. |
| Jitendar | कैसे चलेगी मेट्रो, तय नहीं कर पा रहे तीनों पार्टनर on : July 04, 2013 - 18:00:35 PM |
|
चंडीगढ़। ट्राईसिटी में मेट्रो ट्रेन चलेगी कैसे, यह अभी तक तय नहीं हो पाया है। पंजाब, हरियाणा और चंडीगढ़ में अभी तक इसके फाइनेंशियल मॉडल को लेकर सहमति नहीं बन पाई है। यानी चंडीगढ़ मेट्रो के लिए पैसा कहां से जुटाया जाएगा और इसका इक्विटी स्ट्रक्चर क्या होगा, यह अभी तय नहीं हो पाया है। |
| railgenie | Just make a call for the railway complaints - बस एक कॉल से दूर होंगी रेलवे की शिकायतें on : July 04, 2013 - 16:00:13 PM |
|
शिकायतों पर त्वरित कार्रवाई और निगरानी की व्यवस्था रेलवे में बढ़ने जा रही है। बुकिंग टिकट, रिजर्वेशन टिकट, गंदगी, अव्यवस्था, ओवर चार्जिंग, घटिया खानपान और कर्मचारियों के दुर्व्यवहार की शिकायतों के लिए यात्रियों को शिकायत पुस्तिका तलाशने की जरूरत नहीं रहेगी। यात्रा के दौरान या उसके बाद यात्री आसानी से अपनी शिकायतें रेलवे तक पहुंचा सकेंगे। |
| Mafia | Just make a call for the railway complaints - बस एक कॉल से दूर होंगी रेलवे की शिकायतें on : July 04, 2013 - 16:00:06 PM |
|
शिकायतों पर त्वरित कार्रवाई और निगरानी की व्यवस्था रेलवे में बढ़ने जा रही है। बुकिंग टिकट, रिजर्वेशन टिकट, गंदगी, अव्यवस्था, ओवर चार्जिंग, घटिया खानपान और कर्मचारियों के दुर्व्यवहार की शिकायतों के लिए यात्रियों को शिकायत पुस्तिका तलाशने की जरूरत नहीं रहेगी। यात्रा के दौरान या उसके बाद यात्री आसानी से अपनी शिकायतें रेलवे तक पहुंचा सकेंगे। |
General Discussion
|
|
PNR Predictions
|
|
Train Discussion
|
|
Feedback
|
Indian Railways News
|
