Indian Railways News => | Topic started by Mafia on Sep 18, 2013 - 17:57:08 PM |
Title - Foot-over-bridge commissionedPosted by : Mafia on Sep 18, 2013 - 17:57:08 PM |
|
A foot-over-bridge connecting all the platforms at Salem Railway Junction was inaugurated here on Tuesday.Constructed at a cost of Rs. 1.2 crore, the foot-over-bridge is of a steel structure with concrete pathway. Non-slippery ceramic tiles have been used for the steps and pathways to connect platforms 1,2,3,4 and 5.For the convenience of the passengers, the roofs have been covered with aluminium sheets.Currently, work is on to install lift service in platform 1 and 3 each at a cost of Rs. 30 lakh.After obtaining license and lifts becomes operational, it will be possible for senior citizens to reach platform 1 and 3 using the lift and also the foot-over-bridge. |