Indian Railways News => | Topic started by eabhi200k on Aug 15, 2012 - 08:00:08 AM |
Title - A word of caution to LIC and Metro RailPosted by : eabhi200k on Aug 15, 2012 - 08:00:08 AM |
|
Crack not due to underground work, but routine inspections a must, say experts. Structural engineers have a word of caution for Chennai Metro Rail Limited (CMRL) and LIC in the report on the cause of the crack observed on the 11 floor of the iconic building on Anna Salai.While LIC has been asked to hold inspections periodically, CMRL has been asked to conduct tests to ensure safety.Ruling out metro rail work as the cause of the crack, the report recommends that repair works be initiated immediately, and that LIC carry out inspection once in five years to ensure the structure is effectively maintained.Experts in structural engineering have also recommended that CMRL, on its part, take up relevant tests to ensure the desired strength and durability of the reinforced underground concrete diaphragm wall. This is because they suspect the operation of the vibro hammer resulted in damage to the reinforced concrete diaphragm wall.Since the LIC building is asymmetrical, the exterior wall needed to be inspected to check the pattern of cracks, and the depth of the cracks had to be ascertained. Following that, suitable repair methodology can be proposed to seal the cracks, the report said.On July 11, a crack was observed on the 11 floor of the LIC building. Then, engineers at LIC attributed it to the ongoing metro rail construction work at the underground station site near the buildings. |