Indian Railways News => Topic started by RailEnquiry Admin on Jun 16, 2018 - 13:00:57 PM


Title - Special Traffic and Power Block for New Platform at Parel on June 17
Posted by : RailEnquiry Admin on Jun 16, 2018 - 13:00:57 PM

Central Railway will carry out the work of slewing of existing down local line connecting with pre laid new track between Parel and Dadar stations and commissioning of New Down local line platform at Parel station on June 17  from 9.30 am to 05.30 pm.

Down slow line suburban services leaving Chhatrapati Shivaji Maharaj Terminus from 9.05 am to 5.24 pm will be diverted o­n Dn fast line between Byculla and Matunga stations halting at Parel (double halt), Dadar and Matunga stations and further re-diverted to Down local line.

Down suburban services will not be available at Chinchpokli and Curry Road stations. However passengers of these stations are permitted to travel via Parel.

Down fast/semi fast services leaving Chhatrapati Shivaji Maharaj Terminus from 9.29 am to 4.45 pm will halt at Kurla, Ghatkopar, Vikhroli, Bhandup, Mulund and Diva stations in addition to their respective schedule halts and will arrive destination 20 minutes behind schedule
Up fast/semi fast locals leaving Kalyan/Thane from 9.07/9.30 am to 4.02 pm will halt at Diva, Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.
All Down and Up slow line services leaving / arriving Chhatrapati Shivaji Maharaj Terminus between 9.30 am to 5.30 pm will arrive destination 10 minutes behind schedule.